Story
Built in 1905. Arrived at the Swanage Railway in 1987 and returned to service following restoration in 1992. It is owned by Drummond Locomotives Limited. Boiler ticket expires late 2017.
Technical details
Series | M7 |
Set-up | B2' (0-4-4) |
Length | 10570 mm |
Diameter driving wheels | 1702 mm |
Weight full | 61 ton |
Gear | Stephenson |
Cilinders | 2: 470x660 mm |
Fuel capacity | coal: 3,3 ton |
Water capacity | 5 m3 |
Power | 87.9 kN |
History
Date | Event | Owner | Series | Identification |
---|---|---|---|---|
1905 | Build for | London and South Western Railway | M7 | / 53 |
1923 | Take over by | Southern Railway | M7 | / 53 |
1948 | Take over by | British Railways | M7 | / 30053 |
1966 | Donated to | Steamtown National Historic Site | M7 | / 30053 |
1986 | Sold to | Drummond Locomotives Limited | M7 | / 30053 |
Links to other sites
Photos
Forum topics regarding this engine:
There are no specific topics regarding this engine.
Write A Comment
Sorry, you have to be signed in to write a comment.
Connect With Us