Story
Technical details
Series | 44 |
Set-up | 1'E (2-10-0) |
Length | 22620 mm |
Diameter driving wheels | 1400 mm |
Weight full | 110 ton |
Overheated area | 100 m2 |
Grate area | 5 m2 |
Gear | Heusinger |
Cilinders | 3: 550x660 mm |
Fuel capacity | coal: 10 ton |
Water capacity | 32 m3 |
Power | 1910 pki |
Remarks | Engines for work on freight trains in the mountains. The first were build in 1926. The last in 1949. In total 1989 engines were build. Many engines continued their work outsite Germany after WW II. |
History
Date | Event | Owner | Series | Identification |
---|---|---|---|---|
1940 | Build for | Deutsche Reichsbahn Gesellschaft | 44 | / 44 177 |
1945 | Take over by | Deutsche Reichsbahn | 44 | / 44 177 |
1970 | Renumbered by | Deutsche Reichsbahn | 44 | / 44 0177-4 |
1982 | Retired | Deutsche Reichsbahn | 44 | / 44 0177-4 |
1991 | Sold to | Dampflokmuseum Hermeskeil | 44 | / 44 177 |
Links to other sites
Forum topics regarding this engine:
There are no specific topics regarding this engine.
Write A Comment
Sorry, you have to be signed in to write a comment.
Connect With Us