Story
Engine 950 was sent to West South Africa (Namibia) during WW I. The railways there were controlled by the SAR. The engine returned to South Africa in 1961.
Technical details
Series | 7 |
Set-up | 2'D (4-8-0) |
Length | 15265 mm |
Diameter driving wheels | 1086 mm |
Weight full | 76 ton |
Grate area | 2 m2 |
Gear | Stephenson |
Cilinders | 2: 432x584 mm |
Fuel capacity | coal: 5,1 ton |
Water capacity | 10 m3 |
Power | 88,1 kN |
History
Date | Event | Owner | Series | Identification |
---|---|---|---|---|
1892 | Build for | Cape Government Railways | 7 | / 315 |
1912 | Take over by | South African Railways (Transnet Freight Rail) | 7 | / 950 |
1973 | Take over by | City of Upington | 7 | Grietjie/ 950 |
Links to other sites
Forum topics regarding this engine:
There are no specific topics regarding this engine.
Write A Comment
Sorry, you have to be signed in to write a comment.
Connect With Us